Here is our Standard Operating Procedure, which we have used since 2017. All our crews are trained extensively on these procedures.
Preparation of Jobsite (Interior) SOP
Purpose
The purpose of this document is to provide a Standard Operating Procedure for residential interior jobsites. Based on years of experience, this is the boiled-down version of how each jobsite should be prepped so our employees don’t waste hours cleaning floors and surfaces such as vanities, toilets, mantles, etc. Clients will see the steps we have put in place and be reassured that we take the time to ensure all areas are covered. We address defective walls in an orderly, systematic way, repeating the same steps on every jobsite.
Scope
This SOP will focus on our initial setup of jobs from start to finish, on the preparation and on mandatory procedures which will be initiated time and time again systematically on all our interior job sites. Additional SOPs will cover paint application, tools, and equipment. Following these procedures will reduce prep and cleanup, allowing more hours to be spent applying paint to surfaces and putting more money in everyone’s pockets.
Roles & Responsibilities
- Project Manager will provide paint, drop cloths, plastic, tape, masking paper, drydex, pivot, ladders, a detailed Scope of Work, brooms with dustpans, garbage bags, and a Henry vacuum and mop/mop bucket, if required.
- Label all cans of paint for each area and place them in rooms where they belong.
- Do a jobsite walk-through with the client and the full crew.
- Crew Leader to assign tasks to employees in order of importance and in sequence – see procedure below for tasks.
Procedure
- DETERMINE THE BEST PLACE TO SET UP A STAGING AREA
- Roll out rubber runners to staging area. Spread out drop cloths to cover the floor completely, providing space for paint and equipment. Be sure to move out from the perimeter of walls.
- Bring in all equipment you need to perform your duties.
- If you find it helpful to set up separate equipment areas, feel free (move them away from the perimeter of the room).
- Very carefully move everything into the center of the rooms to be painted. DO NOT place anything on bedding or on any nicely finished surfaces.
- Place plastic over all contents in the center of the room, completely covering items, countertops, and toilets. Remove all electrical and switch cover plates. DO NOT REMOVE THE FOLLOWING ITEMS:
- Cold air return grates, phone cover plates, cable cover plates, central vacuum cover plates.
- If it doesn’t turn on a light or if you can’t plug a lamp into it, DO NOT REMOVE IT.
- Get a Phillips screwdriver and loosen up the bolts on every doorknob that the door is getting painted by ½ inch. This allows us to cut under the knob cover easily without removing the knob.
- On hardwood floors, tape a line of tape around the entire perimeter of the area you are painting, riding the tape slightly onto baseboards and door casings and frames.
- Carefully unroll the masking paper and tape it continually onto the perimeter tape you placed.
- Place small pieces of tape along the outer edge to keep the masking tight.
- Place drop cloths tight against baseboards over the newly masked areas.
- Place door drops (Regular drops cut down to 36”) in door openings.
Window Coverings
- Slightly loosen the tightening bolts for rod brackets and remove rods and curtains. Place them in an area of the house that isn’t getting painted or that will ensure they don’t get dirty or paint on them.
- Consult Scope of Work to determine if the covering will be reused; if not, then remove bracket as well.
- For blinds, remove sliding front cover, remove blind, tape and label blinds and housing with corresponding matching numbers and place in a safe area.
- Consult the Scope of Work to determine whether the blind is being reused; if not, remove the bracket.
- If window casing and frames are not getting painted and there are blinds in the windows, put them in the fully open position and cover them with plastic.
Pole sanding
Pole sand all walls at this point.
Patching
- Remove all screws and nails from the walls and gently tap with the back of a putty knife around the ridge until it is indented.
- For wall plugs (yellow or blue, non-threaded), cut the rim of the plug and tap it slightly into the walls.
- For threaded wall plugs (white or metal), unscrew plugs and fill accordingly. (NOTE: these plugs normally require a second coat as the holes are fairly large in diameter). Place a small piece of tape adjacent to the hole for the remainder of the 2nd coat of compound.
- Apply a coat of Drydex on these areas, overlapping the wall for a smooth, minimal sanding.
- Reapply if required after 1 hour.
- Place a damp rag below the patched area to catch falling sanding dust. Clean rag out frequently.
- Sand patch from outside ridge inward. Get rid of the ridge and very, very lightly sand center to smooth finish.
- Wiz on a coat of primer after sanding with grid and cut can.
Caulking
- Always have a damp rag with you.
- Insert the caulking tube into the gun, cut a 35-degree angle toward the end of the nozzle, and leave a smaller hole rather than a larger one.
- Apply caulking in a smooth, fluid motion. Start at the corners, finger your bead evenly, and wipe up any excess caulk with your rag. Dampen your finger periodically.
Smashing
- Remove debris from tops of horizontal trim with a duster brush.
- Liberally apply trim paint to top and outside edges of door casings, window casings, crown mouldings, chair-rails and baseboards. Apply liberally, plus re-brushing with a dryer brush after the load is dispersed from the initial dip.
- Go in a clockwise direction. Start with the window and door casings. First, do everything you can access while standing. Tops of chair rails fall into this as well. Complete the room perimeter on your feet. Continue with the baseboards in a systematic circular fashion, just like you did with the casings. If crown moulding requires painting, follow the same procedure; except you can paint those completely while up a ladder.
- DO NOT COMPLETELY PAINT THE TRIM BEFORE THE WALL.
Wall Painting
- Cover all areas with drop cloths, and cover all closet floors completely. IF YOU CAN SEE THE FLOOR ANYWHERE AROUND THE PERIMETER, YOU WILL GET PAINT ON IT.
- Cut upper areas starting in one corner and working your way around the room. While up the ladder, include the tops of door casings and cut around window brackets as well.
- Cut everything that you can reach on your feet…. Sides of door casings, sides of window casings, tops of chair rails if required and around switches.
- Cut everything on the floor. Walls at baseboards, electrical outlets, baseboard heaters, etc.…
- Darker Colours: Apply a horizontal layer of tape on top surface of baseboards for overspray.
- Roll everything starting at one corner, working around clockwise or counterclockwise, as you prefer. Do not start your roll in a tight corner. Allow a minimum of 1 ft to accommodate your backroll. Backroll into the previous section by 1.5 as you go along to allow a smooth, continuous texture.
- Above doors and windows: Do not apply with a freshly dipped sleeve, as it will be too heavy for such a small area. Apply half a roll to the adjacent wall, then finish above the door or windows. Repeat this procedure until you address those smaller areas.
Repeat this procedure for the 2nd coat on the room. ** , ***
** Some painters cut twice and roll twice after that, this is acceptable if the cut isn’t heavy with brush strokes, otherwise repeat above procedure **
*** When cutting high areas such as stairways, great rooms and grand foyers, applying 2 coats to the upper areas are acceptable before rolling ***
Doors and Frames
- Have a damp rag with you.
- Ensure the door drop cloth is positioned far enough under the door.
- Close the door and do the inside of the door first. ** Cut under the knob rim, inside panels, hinges and door closer (if required) and finally bottom of door.
- Cut the latch edge of the door at the latch and bottom. **
- Open the door and repeat on the front of the door.
- Cut the hinge edge of the door and frame, having a rag handy to wipe up any paint that gets on metal. **
- Cut the door frame, ensuring it fits tightly to the flooring at the bottom of frame.
- By painting the inside of the door first, you will not have to shut the door onto fresh paint on the hinge side of the frame, avoiding smears and marks from the door stop. ** After applying both edge paint on doors it is imperative to dry brush both the front and back of doors at that edge. It will run and create a huge drip if you don’t address it immediately after the edge is complete.
Window and Door Casings
- Paint door and window casings. Also paint window sills and the interior of the window frame, if required.
- Apply a thick, dripping-brush-load coat, then return to smooth it out once your brush is drier. This ensures full coverage and provides a thorough coat, where one coat would be sufficient to achieve a great appearance. This also applies to door frames and the interior of door panels. See section on baseboards for applying in one coat; it is similar, but there is a method.
Baseboards
- You are now ready to remove the tape from the top of the baseboards, as well as all tape and masking paper from the perimeter of the room.
- Application of baseboard paint is similar to casings, but we have the gravity factor. Our initial loaded brush cannot be applied to the bottom part of the baseboards; otherwise, gravity will pull it onto the flooring as you draw from this paint load. Apply it to the upper area of the baseboards and draw smoothly on an angle until it reaches the quarter round or shoe moulding. After the initial draw releases enough paint onto the larger surface of the base, you will be ready and loaded perfectly to draw your line between the floor and the bottom of the quarter round or shoe moulding. *
- You can apply the same procedure to the casings by applying thick coats to the upper surface, drawing it out, and re-brushing it when you run out of paint on your brush—effectively spreading the paint out evenly and continuously.
- After many years of painting baseboards, I find the easiest way to get a nice, perfect line between the quarter round or shoe moulding and the floor is to tilt my head very close to the floor and cut sideways.
Kitchens and Bathrooms
- Follow procedures with masking paper and tape. Plastic off the counter and toilet.
- Drop cloth the tub and floors. Plastic off kitchen cabinets*, tape off crown moldings and hang plastic from inside edge of tape from crown essentially creating a plastic curtain over the entire cabinet: plastic off islands, counters etc. in the same manner.
- Perform all routines with trim, cutting and rolling of walls.
- We only do this when painting ceilings in kitchens.
Ceilings
- Ensure all flooring is completely covered before painting the ceiling.
- Tape and plastic off light fixtures, smoke detectors, speakers or any other object that can’t be removed.
- Pop out pot lights and let them hang. You can roll right up to them.
- Roll the perimeter of the room first. Go over with a dry roller to catch any drips on the walls; use a brush if needed.
- Roll out room perpendicular to the window.
- Repeat the perimeter; roll the 2nd coat toward the window.
- Dab paint into corners with brush.
Stipple Ceilings with Smooth Perimeters
- Follow same prep points as above procedure.
- Carefully paint the perimeter stipple ceiling first in the same manner as above.
- Smash in the 4” perimeter with a brush and cut can.
Switching from Stipple to Flat Ceilings
- ENSURE YOU ARE USING PAINT THAT DOESN’T HAVE STIPPLE IN IT. Use a nylon filter sock to filter out stipple-compromised paint into a fresh, clean cut can or 5-gallon pail.
- Change the roller sleeve to a fresh one or one that you know didn’t paint stipple before. *
*Keep a separate area or bag for stippled sleeves, clearly marked with Sharpie, in your go bag.